Public Notification of Road WorksFrom 16th of May to 18th of May, there will be a planned Railway track maintenance works at Cross road, Sulphur Point level crossing from 06.00AM until 06.00PM each day. A Stop-Go closure will be installed on site for the road works. There will be work vehicles and crew where Remove Rosehill panels, fastening and fixing the Railway lines on 16/05 and resurface with Thin Asphalt Concrete will be done between 17/05 to 18/05. Access will be maintained to the affected driveways by STMS/TC on site– if you need urgent access, please approach, and enquire with staff – we will assist you when it is safe. There will also be parking restrictions in place on both sides of Cross road will be in place from 4:00PM on 15th May 2021 until the work ends. The road will be safely managed by NZTA-qualified traffic management contractors, who are also able to assist with parking of vehicles and managing access to your properties. We understand that Road Works can be at times frustrating, annoying, and seemingly excessive; please rest assured that we do our utmost to keep the contractor(s) safe alongside the general public and as a result are sometimes required to close areas off. If you have any concerns or complaints about this operation, please do not hesitate to contact us, we will assist wherever possible. Leo Jones Business Development Manager 027 6969048 [email protected] Road Safe Traffic Management Limited 124 Whakakake Street, Tauriko Tauranga 3112 Comments are closed.
|
Archives
|